You don't have javascript enabled. Good luck with that.
Pencarian
Penyedotan Genangan Banjir di Cempaka Putih
....
photo Anita Karyati - Beritajakarta.id

Six Pumps Handle Flooding in Cempaka Putih Area

Six mobile pumps had controlled flooding that hit several points in Cempaka Putih Sub-district area, Central Jakarta, on Tuesday (1/18).

We send six pumps with 300 liters per second capacity to minimize flooding

Cempaka Putih Sub-district Vice Head, Erik AP revealed, rain that had been pouring down Jakarta from noon until late in the afternoon had triggered flooding as high as 20 to 40 centimeters along Jalan Cempaka Putih Barat and Timur.

"We send six pumps with 300 liters per second capacity to minimize flooding," he expressed.

SDA Agency Adds 26 New Mobile Pumps in 2021

According to him, it occurred as a levee on the west side seeped thus the water from the Utan Panjang River overflowed. It was made worse with intense rain. He committed, flooding would recede in three hours.

"On Jalan Mardani and Percetakan Negara, flooding has receded after being sucked," he stated.

Linked News
Popular News indeks
  1. Joint Personnel Control Green Lane in Petamburan

    access_time25-04-2024 remove_red_eye903 personBudhi Firmansyah Surapati
  2. Waste Sorting Education Given for 500 Students of SDN 07

    access_time26-04-2024 remove_red_eye716 personAnita Karyati
  3. Central Government Teams Up with Japan to Realize Jakarta with TOD Concept

    access_time25-04-2024 remove_red_eye611 personFolmer
  4. 37.25 Ton of Campaign Prop Waste in West Jakarta Recycled

    access_time26-04-2024 remove_red_eye478 personTP Moan Simanjuntak
  5. LRT Phase 1B Construction Remains Positive

    access_time27-04-2024 remove_red_eye403 personAldi Geri Lumban Tobing